Bay Consulting Engineers
Engineering and Project
Management
Bay Consulting Engineers is a multidiscipline engineering and project
management firm that serves industrial, institutional, governmental,
and commercial clients. Bay Consulting Engineers is best suited
to help clients with process intensive projects in the microelectronics,
bio-pharmaceutical, nano-materials, and specialty materials sectors.
Our team has worked together for many years in the Silicon Valley
and Internationally. Based on this proven, cohesive and successful
work experience the team formed Bay Consulting Engineers Co.Ltd
in November of 2003 to offer clients quality professional engineering
and project management services.
We perform with a highly skilled professional team working together,
using common sense, practical experience, and best in kind methods
and practices. We are guided by the following principles:
Responsiveness to customer needs.Provide professional quality services
on time and on budget. Develop a follow-up strategy to gauge performance
with all customers. As a full service multidiscipline organization,
Bay Consulting Engineers controls budget, schedule and quality with
effective management of all projects. This type of service which
has been traditionally offered by large organizations with correspondingly
large overheads, is sorely missing in the slimmed down Silicon Valley.
Projects can be delegated to Bay Consulting Engineers directly or
arrangements can be made to supplement and assist our clients in-house
staff.
Bay Consulting Engineers offers complete 'one-stop- shop'
multidiscipline engineering and project management services for
industrial, institutional, governmental, and commercial
facilities.
Professional
- LEED Certified – Sustainable and Green Designs.
- Close Collaboration with Academia – Stanford, Berkeley and
Arizona
State.
- Professional Organizations Membership– ISPE, ASHRAE, IEEE,
ASME, AIChE, SEMI.
Sample Projects Performed:
Bay Consulting Engineers has performed projects in Santa Clara,
Alameda,
San Mateo, and Sonoma Counties.
Bay Consulting Engineers is the engineer of record for the
mechanical
systems design of multiple projects for the Mask Operation site
renovations
for a confidential client in the South Bay. This is the largest
construction
project for an industrial facility at present in Santa Clara
County. The exact
construction value has not been disclosed, but we estimate it to
be in excess
of $50 million.
Bay Consulting Engineers is performing engineering services for
multiple
projects for Alza Corporation in Mountain View. These projects
include the
following:
· Development of air flow diagrams for existing laboratories and
the
HVAC equipment; analyze and resolve lab pressurization concerns.
· Design solutions for laboratory hood exhaust systems for
multiple
buildings.
· Design conversion of Building PA-11 chiller plant to
primary/secondary
pumping.
Bay Consulting Engineers has performed evaluations for air
handling units
for Genentech in South San Francisco to resolve temperature
distribution
concerns.
Bay Consulting Engineers has completed designs for multiple
projects for
Hitachi Global Storage Technology in San Jose.
Bay Consulting Engineers is the architect and engineer of record
for the
detail design of the 96 unit Apton Apartment Complex in Milpitas
that is now
in design phase. The value of the construction will exceed $12
million.
Client References
Mr. Eric Haraga, Managing Partner, Ei8ht Entertainment Group,
408-757-7447
Ms. Natalie Thomas, Project Manager, HMC Architects,
408-977-9160
Ms. Melinda Lum, Project Leader, HMC Architects, 408-977-9160
Mr. Donovan A. Dolojan, Project Manager, HMC Architects,
408-977-916
Mr. Jose Yow, Project Engineering Manager, Intel, 408-765-9471
Mr. Hugo Ojeda, Facilities Program Manager, Hitachi,
408-717-6412
Mr. Rod Mahdavi, Sr. Facilities Engineer, Alza-Mountain View,
650-564-3026
Mission Statement
Bay Consulting Engineers strives to deliver to our clients
outstanding
engineering and project management services; to provide
fulfilling
careers and professional satisfaction for our people; and to
achieve
financial success so that we can reward ourselves and grow.
Why Bay Consulting Engineers
is the Right Choice?
Proactive Help for You
- Principals active in all projects
- Fresh ideas that will make a difference
- Clear and concise communication during the project
- Big firm experience, small firm attention
- Direct service approach – no extra layers or extra costs
- Local decisions and direction, national and international
resources
Timely, Reliable Responses to Your Needs
- Four hour response to phone calls
- We meet deadlines
- Voice mail and email to all principals and employees
- We can meet you today or tomorrow
People Who Know your Business
- Your information is confidential and secure
- We hire only experienced engineers and designers
- You do not pay for training or startup costs
- We work closely with your team to leverage their abilities
General Services
Bay Consulting Engineers offers complete design and project
management
services to clients. These services can be any or all of the
following:
· Project definition, programming, planning, and organization.
· Site Master planning.
· Rezoning and obtaining of building permits.
· Managing the design process through construction documents.
· Expedite plan checking through authorities having
jurisdiction.
· Preparation of bid documents.
· Managing startup and commissioning process.
· Preparing as-built record drawings and assembling owner’s
manuals.
Discipline Services
Bay Consulting Engineers offers clients multidiscipline
engineering
capabilities in the following areas:
· Project Management
· Mechanical/HVAC
· Plumbing
· Chemical / Process Systems and Piping
· Electrical
· Telecommunication
· Life Safety
· Site Security and Safety
· Instrumentation and Controls
· Automation and Systems Integration
· Process Optimization; and Sustainable and Green Design
· Risk Assessment and Minimization
MOZART FAIZI, PE, RCDD
PRINCIPAL – ELECTRICAL
408.933.8900
moefaizi@yahoo.com
Overview
Mr. Faizi's primary focus remains solidly in the high risk, high
exposure, technology dependent mission critical and essential
systems projects requiring extensive, intensive facility and
infrastructure expertise. Projects are engaged to encompass all
aspects from the initial programming stages to and through the
post-startup commissioning processes. The tasks inclusive run
the gamut from initial conceptual studies and document
development through engineering and design document preparation
and on to the construction administration and oversight
services.
Mr. Faizi has over 22 years of experience in electrical
engineering and project management in industrial, institutional,
advanced technology, and commercial projects. In his own
business, Mr. Faizi led and staffs projects, develops division
standards, master specifications and QA/QC programs. He
instructed in house fundamental engineering and design
coursework for junior engineers and designers. Mr. Faizi also
was responsible for budgets, schedules, manpower loading,
proposals, designs, and engineering providing engineering and
design technical as well as project management expertise, QA/QC,
review, and approval of electrical documents for construction.
Mr. Faizi specializes in performing short circuit and device
coordination studies, arc flash hazard analysis, engineering
cost analysis, Code compliance reviews, and detailed
cross-discipline engineering and design coordination of
electrical and mechanical systems for power, lighting, low
voltage controls, and hazardous/highly toxic materials
dispensing and use. Mr. Faizi has extensive specialized
experience in the mission critical industries at all levels,
with special emphasis in public and private Internet Data
Centers and computing facilities, semiconductor manufacturing
and research facilities, and large campus infrastructure
projects. In the rare occasion that expert witness services are
required, Mr. Faizi provides specialized electrical systems
forensic analysis including due diligence investigations,
depositions, and courtroom testimony
Experience – Overview
- Low, medium and high voltage system design, substation, Data
Center and associated distribution. Perform service entrance
sizing and specification. Examine multiple design options for
primary and secondary metered service voltage to customer.
- Electrical design engineering and calculations of power cable,
lighting, and grounding system.
- Designing projects using renewable energy sources with
coordinating grid ties to the utility company and understanding
key design issues for:
Grid tied photovoltaic using mono and multicrystaline modules,
amorphous laminates.
BIPV photovoltaic system.
Wind turbine systems.
Cogeneration microturbines.
- Executing California Title 24 energy Compliance documentation.
- Providing design criteria specification for design built
projects.
- Various tenant improvement and retrofits to existing
buildings, chiller and HVAC installation and providing landscape
/ exterior lighting.
- Providing a complete fire Alarm and life safety
design-engineering package.
- Value engineering studies.
- Power and controls, grounding, panel layouts, interconnection,
logic, schematic and elementary diagrams, and conduit cable
schedules.
- Skilled in performing circuit breaker coordination studies and
short circuit analysis using SKM PTW (windows version of DAPPER
and CAPTOR) programs.
- Design of clean room facilities, tool hook up, and fit up.
- Special emphasis in high technology industries such as
semiconductor facilities, research and development laboratories,
data centers/computer, health care facilities and pilot plant
operations with various type of emergency power requirements.
- Vast knowledge of voice, data and video distribution systems
within and between buildings, as well as LAN and internetworking
basics.
- A vast knowledge of AutoCAD, Microsoft and PC Network systems
and how they benefit the workplace through proper utilization.
My intention is to acquire a position with a company that can
use my skills to promote company and personal growth. I have
configured many AutoCAD stations including Taylor customization
and programming of Menu and Lisp routines.
Significant Accomplishments
- I.A.E.I. (International Association of Electrical Inspectors),
Chapter Member since 1992
- Certified Electrical Inspector and Plan reviewer
- Very familiar with National Electric Code (N.E.C.)
- Five-day Electrical Engineering Class covering three-phase
analysis and the use of Power Tools Software
- Registered Communications Distribution Designer (RCDD)
Registrations
Professional Engineer: California, Arizona, Washington, Oregon,
Nevada
Our Projects
Top Clients get Top Services from
Top Professionals
Microelectronics
Project Manager and Lead Mechanical Engineer -ST Microelectronics,
Phoenix, Arizona: Design of a 2400-ton variable flow chiller plant
to replace an existing chiller plant at Building 1100. New chiller
plant incorporates energy efficiency features such as variable speed
drives, single loop chilled water pumping, and waterside economizers.
Project Manager and Lead Mechanical Engineer - ST Microelectronics,
Phoenix, Arizona: Design of a 7000 square-foot, Class 1 cleanroom
expansion for the EPI process. Expansion included adding flammable
and corrosive gas storage areas.
Project Manager and Lead Mechanical Engineer - Seagate, Milpitas,
California: Design for retrofit of 5000 square-foot building for
the installation of a plating line. The retrofit included adding
a Class 1000 cleanroom around the plating line.
Project Manager, Lead Mechanical Engineer, and Lead Architect -
National Semiconductor, Santa Clara, California: Design for the
retrofit of 14,000 square-foot conversion of an existing fab to
a copper process fab. Project included upgrading the existing fab
to Class 1 cleanrooms.
Project Manager, Lead Mechanical Engineer, and Lead Architect -
National Semiconductor, Santa Clara, California: Retrofit design
for replacing two 45,000 CFM air-handling units for fab in Building
E.
Project Manager, Lead Mechanical Engineer, and Lead Architect -
IBM, Guadalajara, Mexico: Design of a new 17,000-square-foot chemical
storage and distribution facility. Facility included flammable and
general storage of virgin and used chemicals for IBM�s disk drive
assembly factory in Mexico.
Project manager - Intel Corp., Kiryat-Gat, Israel: Complete design
and construction of 1,260,000 square-foot greenfield semiconductor
manufacturing facility, including an 85,000 square-foot Class 1
cleanroom, a 75,000 square-foot central utility building, 400,000
square-foot, four-story office building, 80,000 square-foot office/warehouse,
and 30,000 square-foot hazardous material storage building (Fab
18).
Lead Electrical Engineer and Lead Architect- Episil, Tai Nan, Taiwan:
Electrical engineering design of one 161 KV GIS, transmission substation
with multiple 22.8 KV supporting substations for a large Episil
cleanroom facility. Design includedN+1 redundancy and emergency
power requirement.
Lead Electrical Engineer Novellus, San Jose, California: Design
of a 100,000 square-foot cleanroom facility for training purposes.
Design of 90,000 square-foot Class 1 cleanroom facility, including
tool fit‑up and tool hook‑up. Complete design of power distribution
system, calculations of power distribution cable, lighting and grounding
systems and California Title 24 Energy Code study.
Lead Electrical Engineer Intel, Chandler, Arizona: Design and construction
services for upgrades of power distribution system and a substation
with tiebreaker. Electrical design and calculations of power cable,
lighting and grounding, life safety and special systems for buildings
C3, C4, C10, C1 1, and Fab 6. Provided short circuit analysis and
breaker coordination study for site engineering department. Responsibility
for Migrating controls devises for 21 HVAC, VFD/AFD and exhaust
fan units from Johnson Control to NCU/NEU FMS system, including
preparation of PandIDs, point-to-point control diagrams, and riser
diagrams.
Lead Electrical Engineer Intel, Santa Clara, California: Lead a
team of 10 employees to provide tool hook-up and fit-up service
for 300 tools for D2 fab, phases 1,2,3 and 4.
Lead Electrical Engineer and Lead Architect- Intel, Santa Clara,
California: Feasibility study for a proposed new Building 5 to provide
additional power and secondary substations.
Lead Electrical Engineer Motorola, Scottsdale, Arizona: Design for
the addition of a new substation, cleanroom and motor control center,
including lighting, power, special systems design and construction
administration for facility system upgrades.
Lead Mechanical Engineer - Intel Corp., Chandler, Arizona: Master
planning, design, and construction services for a 1,300,000‑square-foot
sub-micron microelectronics manufacturing facility with Class 1
cleanrooms (Fab 12). Responsibilities included feasibility analysis
for a 75 MW cogeneration plant.
Project Manager - Applied Materials, Santa Clara, California: Maydan
technology center design and construction administration services.
Life Safety Engineer - Applied Materials, Santa Clara, California:
Turnkey design and construction of the life safety system for the
Santa Clara campus site.
Project Manager, Lead Architect and Lead Mechanical Engineer - Applied
Materials, Japan: Feasibility analysis for upgrade of 20,000 square-foot
applications laboratory.
Project Manager, Lead Architect and Lead Mechanical Engineer -Applied
Materials, Korea: Multidisciplinary schematic design services for
a new applications laboratory.
Project Manager and Lead Life Safety Engineer - Applied Materials,
Taiwan: Design and construction administration services for the
life safety systems for a new applications laboratory.
Project Manager, Lead Mechanical Engineer, and Lead Architect -
VLSI Technology, Inc., San Jose, California: Complete design and
construction administration services for a new 3,600 square-foot
Class 1,000 product development laboratory.
Project Manager, and Lead Mechanical Engineer- Nikon Precision,
Belmont, California: Complete design and construction administration
for a new 5,000 square-foot Class 10,000 product development and
testing cleanroom.
Lead Mechanical Engineer - SEEQ Technology, Milpitas, California:
Complete design for retrofit of an existing cleanroom and hookup
design for installation of Nikon steppers.
Project Manager and Lead Mechanical Engineer - Bell Communications
Research, Red Bank, New Jersey: Complete design for a humidity control
system upgrade of 200,000 square-foot research and development facility.
Lead Mechanical Engineer - Intel Corp., Rio Rancho, New Mexico:
233,000‑square-foot expansion of sub micron microelectronics manufacturing
facility with 43,000 square feet of Class 1 cleanroom and expansion
of existing support facilities (Fab 11P1).
Lead Mechanical Engineer - Intel Corp., Jerusalem, Israel: Site
analysis for a new 120,000‑square-foot semiconductor fab (Fab 8).
Lead Mechanical Engineer - Intel Corp., Rio Rancho, New Mexico:
Programming for a 1,300,000‑square-foot sub micron microelectronics
manufacturing facility with 105,000 square-feet of Class 1 cleanroom
(Fab 11P2).
Lead Mechanical Engineer - Intel Corp., Chandler, Arizona: Master
planning, design, and construction services for a 1,300,000‑square-foot
sub micron microelectronics manufacturing facility with Class 1
cleanrooms (Fab 12).
Project Manager - Lam Research, Inc., Fremont, CA: Multidiscipline
design for Class 10 Cleanrooms and Fab.
Project Manager, Lead Mechanical Engineer, and Lead Architect -
Intel Corp., Santa Clara, California: Retrofit design of 7,000 square-foot,
Class 100 tab process room in D2 building.
Project Manager, Lead Mechanical Engineer, and Lead Architect -
Intel Corp., Santa Clara, California: Retrofit design of 15,000
square-foot Class 1 area and multiple Class 100 and Class 1,000
areas (Building D2).
Project Manager, Lead Mechanical Engineer, and Lead Architect -
Intel Corp., Santa Clara, California: Retrofit of existing 60,000
square-foot building to test area (SC‑7).
Project Manager, Lead Mechanical Engineer, and Lead Architect -
Intel Corp., Santa Clara, California: Retrofit of existing 20,000
square-foot building into research and development and test labs
(SC‑9).
Project Manager, Lead Mechanical Engineer, and Lead Architect -
VLSI Technology, Inc., San Jose, California: Design for the addition
of a thermal oxidizer unit for solvent exhaust abatement from existing
semiconductor fab.
Project Manager, Lead Mechanical Engineer, and Lead Architect -
Xerox Corporation, El Segundo, California: Silicon sub micron prototyping
facility, including 16,500 square-feet of cleanroom space.
Project Manager, Lead Mechanical Engineer, and Lead Architect -
Intel Corp., Santa Clara, California: Retrofit design of 3,000 square-foot
Class 1 cleanroom in Fab 1.
Project Manager, Lead Mechanical Engineer, and Lead Architect -
Intel Corp., Santa Clara, California: Design for hookup of various
process tools.
Lead Mechanical Engineer - National Semiconductor, Puyallup, Washington:
Programming for remodel of 14,000 square-foot wafer fab.
Data Centers
Project Manager - US DataPort, San Jose, California: Entitlement,
Permitting, schematic design, design development, establishing project
budget and financial projections for 2.5 million square feet of
data center campus on 174-acre site. Project included 250 MW cogeneration
power plant and 60,000 tons capacity chiller plant.
Project Manager - US DataPort, Prince William County, Virginia:
Entitlement, Permitting, schematic design, design development, establishing
project budget and financial projections for 3.4 million square
feet of data center campus on 186-acre site. Project included 250
MW cogeneration power plant and 80,000 tons capacity chiller plant.
Project Manager - US DataPort, Bayonne and Irvington (2 sites),
New Jersey: Site evaluations, infrastructure investigations, County
and City negotiations for the development of 2.5 million square
foot data center campus on approximately 120-acre sites with 250
MW cogeneration power plants, and 80,000 tons capacity chiller plants.
Project Manager - US DataPort, Guam: Site search, site evaluations,
infrastructure investigations and local government contacts for
the development of 100,000 square foot data center facility.
Development Manager Digiplex, Europe: Turnkey design and construction
of over 1.0 million square feet of data centers throughout Europe.
Development Manager - I-Asiaworks, Asia: Turnkey design and construction
of over 0.5 million square feet of data centers throughout Asia.
Project Manager - Intel Corp., Kiryat Gat, Israel: Design and construction
of a 20,000 square-foot corporate data center.
Project Manger and Lead Mechanical Engineer - Intel Corp., Santa
Clara, California: retrofit of existing 15,000 square-foot building
into computer data center.
Lead Mechanical Engineer - Silicon Systems, Santa Cruz, California:
Retrofit of existing 5000 square-foot area into a corporate data
center.
Lead Mechanical Engineer - Amdahl M-4, Santa Clara, California:
Design of mechanical systems for 10,000 square-foot data center
facility.
Lead Mechanical Engineer - Sentinel Data Center, Santa Cruz, California:
Design of mechanical systems for a 3000 square-foot data center
to support a newspaper publishing plant.
Lead Mechanical Engineer - Visa International, Redwood City, California:
Design of mechanical systems for a 30,000 square-foot data center.
Lead Mechanical Engineer - IDT Building 3, Santa Clara, California:
Design of mechanical systems for a 1000 square-foot data center
to support a wafer fab.
Lead Mechanical Engineer - Amdahl Building 03, Santa Clara, California:
Design of mechanical systems for 11,000square-foot of data center
facility.
Lead Electrical Engineer Microsoft, Mountain View, California: Design
of 1,355,000 square-foot campus with 5,500 square-foot data center
and N+1 redundancy. The project included electrical systems analyses,
value engineering assessments electrical energy compliance evaluations
and design and implementation of a high voltage substation.
Biotechnology, Pharmaceuticals
and Hospitals
Lead Mechanical Engineer - Genentech, Inc., South San Francisco,
California: Design for HVAC upgrade of 18,000 square-foot cell culture
building.
Project Manager Lead Mechanical Engineer - Syntex Corporation, Palo
Alto, California: retrofit design for 10,000 square-foot research
and development facility.
Lead Mechanical Engineer - Biosis, Palo Alto, California: Design
of mechanical systems for a 20,000 square-foot biotechnology facility.
Lead Electrical Engineer - Alza Corporation, Mountain View, California:
As-built and tenant improvement designs for buildings M3, M4, MP1,
MP5 and RC11.
Lead Electrical Engineer - Sugen Inc., San Francisco, California:
Tennant Improvement design and electrical distribution load study,
which consists of harmonic and circuit breaker coordination study
for the entire site.
Lead Electrical Engineer - Chandler Medical Center Hospital, Chandler,
Arizona: Complete electrical design of the hospital facility with
N+1 redundancy for the primary power distribution system.
Lead Electrical Engineer - Scottsdale North Hospital, Scottsdale,
Arizona: Complete electrical design modification package for special
systems, chiller and HVAC installation, landscape and exterior lighting.
Specialty Facilities
Lead Mechanical Engineer - Schilling Foods, Salinas, California:
Design of a specialty process exhaust system from the spice milling
line.
Lead Mechanical Engineer Ito-Cariani (Takenaka International), Hayward,
California: Design of 85,000 square-foot specialty cut meat and
processed meat facility. Plant included two‑stage ammonia refrigeration
system.
Lead Mechanical Engineer - United Technologies, San Jose, California:
Remodel of a building to accommodate the new Therm‑XTM process line.
Project Manager and Lead Mechanical Engineer - Space Systems/Loral,
Palo Alto, California: Retrofit design of existing energy center
and humidity control upgrade for a 30,000 square-foot high-bay,
Class 10,000 cleanroom which houses satellite thermal test chamber.
Project Manager and Lead Mechanical Engineer - Space Systems/Loral,
Palo Alto, California: Design of 5,000 square-foot Class 100,000
link building which houses satellite during transfer between process
buildings.
Project Manager and Lead Mechanical Engineer - Space Systems/Loral,
Palo Alto, California: Complete design for the construction of 85,000
square-foot building, including Class 100,000 high-bay satellite
assembly and test facility (Building 6).
Lead Mechanical Engineer - United Technologies, San Jose, California:
Design of 30,000 square-foot Class 100,000 high bay (Titan missile
manufacturing building).
Project Manager and Lead Chemical Engineer - JDS Uniphase Flex Products,
Santa Rosa, California: Design and construction management of a
80,000 square-foot greenfield thin film deposition facility for
the manufacture of optically variable pigments for printing US and
other currencies.
Project Manager and Lead Chemical Engineer - JDS Uniphase OCLI,
Santa Rosa, California: Design and construction management of a
70,000 square-foot facility for the manufacture of coated glass
and optical components.
Project Manager and Lead Chemical Engineer - Neovac, Santa Rosa,
California: Design and construction management of a 25,000 square-foot
facility for the coating of reel-to-reel high performance materials.
Lead Electrical Engineer - ATT Wireless, Northern California:
Electrical and mechanical design of multiple new cell sites.
Lead Electrical Engineer - Verizon Wireless, Northern California:
Electrical and mechanical design of multiple new cell sites.
Offices, Commercial and Institutional
(Continued)
Lead Electrical Engineer - Fremont Christian School, Day Care Facilities,
Fremont, California: Complete electrical, mechanical and plumbing
engineering and design for new daycare facilities.
Lead Electrical Engineer - Sleep Inn Hotel, San Jose, California:
Electrical, mechanical and plumbing design for a new hotel.
Lead Electrical Engineer - Holiday Inn Express, Hollister, California:
Electrical, mechanical and plumbing design for a new hotel.
Lead Electrical Engineer - County of Santa Clara, Parks and Recreations
Department, Santa Clara, California: Electrical and mechanical systems
renovation of various parks.
Lead Electrical Engineer - Billy De Frank Community Center, San
Jose, California: Complete electrical, mechanical and plumbing design
for the renovation of existing community center facility.
Lead Electrical Engineer - San Jose Redevelopment Agency, San Jose,
California: Complete electrical engineering design for City of San
Jose�s various streetscape, parks, and public areas lighting system
projects.
|